Contact Us
Covanta 

Onondaga

5801 Rock Cut Road
Jamesville, NY 13078 
CONTACT US

View Emissions Data

Back to our Facilities
Covanta Onondaga

Reducing Landfill Waste

Located in Jamesville, New York, the Onondaga County Resource Recovery Facility is an award winning Waste-to-Energy Facility that serves the residents of Onondaga County and the greater Syracuse region with reliable and sustainable waste management. Together with the county, we have built a world-class system that prioritizes recycling and relies on energy recovery for material that remains.

In addition to keeping waste out of landfills, we’re committed to ensuring safe operations and minimizing environmental impacts. We have been consistently recognized for exceptional operations, including OSHA’s stringent Voluntary Protection Program Star certification.

Fast Stats: Annual Performance

Every year, our facility processes more than 360,000 tons of waste that would otherwise have ended up in landfills.

co2-down-icon

Less waste in landfills reduce greenhouse gas emissions by 238,000 metric tons of CO2. That’s like taking 51,000 passenger vehicles off the road for one year.

power-a-house-icon

We use waste to produce 39 megawatts of electricity 24/7 - enough to power 21,000 homes for a year.

recycle-icon

We also recover 12,800 tons of metal for recycling annually - enough to build 10,000 cars.

Join Our Team

Learn More

Superior Environmental Performance

We care about our communities and operate well below emissions limits. Over 99.9 percent of what comes out of our plant’s stack is what you’d typically find in air - water vapor, nitrogen, oxygen, and carbon dioxide. The remaining constituents are well below federal and state standards.

The following data is presented in units required by the facility's permit as averaged emissions.

a. Permit Limits are derived from USEPA standards for Large Municipal Waste Combustors (40 CFR 60, Subparts A, Cb and Eb).
b. CO values are the maximum 4-hr block average for that day.
c. SO2 and NOx values are the daily (24-hr) block averages for that day.
d. Opacity values are the maximum 6-minute average for that day.
e.  All emission values reported in units consistent with the permit:
     CO, SO2 and NOx reported as parts per million, dry gas basis at 7% O2 (ppmdv7), Removal Efficiency and Opacity as %.
f. SO2 compliance is based on concentration (ppm) or removal efficiency (% reduction between inlet and outlet emissions).
g. The dash symbol (-) indicates that a unit is off-line, has insufficient data for a compliance period or is in an exempted period.

*Results are provided for informational purposes only. Data is posted 24 hours after completion of each day to allow for quality assurance/quality control (QA/QC) review.

Read the Continuous Emission Monitoring  System (CEMS) FAQs to learn more

For more information on facility performance click here.

Process in Action

Waste-to-Energy: How Does It Work?

Waste-to-Energy takes non-hazardous waste - otherwise destined for landfill - and combusts it to generate steam for electricity generation. Ash is processed to recover metal for recycling while all gases are collected, filtered and cleaned before being released safely into the atmosphere.

Learn More

Join Our Team

Learn More